IT Partner Jakarta
Jakarta

Network Cabling

I handle structured network cabling for offices and SMBs: from UTP/FTP Cat5e, Cat6, up to Cat6a and short-run fiber optic. Every point is tested and labelled so it stays easy to maintain.

What's included

How it works

  1. 01

    Site survey

    I visit the site to review cable routes, the number of points, and your needs.

  2. 02

    Proposal & estimate

    You get a clear breakdown of materials, point count, and a cost estimate.

  3. 03

    Installation

    Cable pulling and termination are done neatly without disrupting office operations.

  4. 04

    Testing

    Every point is tested to ensure a stable, standards-compliant connection.

  5. 05

    Documentation & handover

    Labels, route diagrams, and configuration notes are handed over to you.

Supported brands

Networking

  • Ubiquiti UniFi Ubiquiti UniFi
  • MikroTik MikroTik
  • Ruijie Ruijie
  • TP-Link Omada TP-Link Omada
  • Cisco Cisco

Common questions

How long does network installation take?

It depends on the number of points and site condition. A small office (10–20 points) usually takes 1–3 working days.

Cat5e or Cat6 — which do I need?

For most offices Cat6 is a good choice as it supports gigabit reliably. Cat5e is enough for basic needs.

Can old cabling be tidied without disrupting operations?

Yes, tidying can be scheduled after hours or on weekends so operations are not disrupted.

Need this service?

Free Consultation

Related services